PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and compacting at Rahway Ave. Facing the Administration Building (800x600).jpg Continued installing the metal stairs at Stair -5 Facing West (800x600).jpg Excavating at Rahway Ave. past the Bridge Facing the New Court Building (800x600).jpg Finished installing the shear wall panels at Elev. 5,6 (4th Floor) Facing West (800x600).jpg Installing bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600).jpg Piping at the Sprinkler room Facing South-East (800x600).jpg Underground piping at Rahway Ave. past the bridge Facing the new Court Building (800x600).jpg
Previous pageNext page Installing bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600)
Installing bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600)